Ali Saad

Contract Variance report with Shift Notes

A report cloned from an existing Core report, with a Shift Notes column added at the end.

Business problem

  • Analysts needed each day's shift note beside contract variance data.

Solution

  • Pick the first clocked-in segment's note for the day, falling back to the first segment with a note, capped at 100 characters.

Implementation

  • Daily segment rules confirmed with the analyst
  • Notes shown independent of Print Date Detail
  • Restructured to the RecordInfo pattern

Challenges

  • Row and column alignment in the detail line
  • Reviewer-requested refactor into smaller methods

Results

  • Passed QA
  • Refactored to the team's code standard

Tech stack

  • .NET
  • C#
  • TimeClock Plus Core
Back to projects